Smithtown · issues
Civic issues
Topics getting the most attention in Smithtown public meetings, ranked by how frequently they come up.
Country Pointe Estates Condominium Development
A proposed 288-unit condominium project in Kings Park is up for a planning board recommendation, which will shape future housing density and local infrastructure considerations.
Cox & Sons Industrial Landfill Remediation and Trucking Station Proposal
A proposed trucking station on Old Northport Road in Kings Park has residents furious about truck traffic past schools, air quality, noise and road damage on Town Line Road. The hearing was adjourned to December 15 without a presentation, and neighbors demanded accountability over how the Suffolk County Land Bank property drifted from its original RFP intent.
Commercial Hotel Expansion on Vanderbilt Motor Parkway
A 122-room, four-story hotel with a food retail drive-through is proposed at the former Gasho restaurant site in Hauppauge. It needs a stack of variances and a town board special permit; the zoning board held off pending county review.
Industrial Manufacturing and Outdoor Storage Operations at Pelkowski Precast
Pelkowski Precast wants to expand its Kings Park concrete operation with outdoor storage, tall walls and reduced setbacks. The case was adjourned to December 15 after the applicant's attorney missed the meeting.
Beechwood Condominium Development Proposal
Beechwood Smithtown LLC is proposing a large 288-unit condominium community in Kings Park. The project requires special consideration because it involves building on and altering steep, environmentally sensitive slopes.
Industrial Storage and Trucking Facility Modifications
Residents of Tulipwood Drive and surrounding neighborhoods strongly opposed a trucking station operating at 57 Mall Drive in Commack, citing severe noise, diesel and refrigeration hums starting at 3 a.m., chemical odors, and buffer encroachments.
Branchinelli's Site Plan & Septic Upgrade
Branchinelli's is expanding its parking lot and upgrading its septic system by filling in an old recharge basin. The changes aim to improve traffic flow and solve under-capacity septic issues at the Route 111 location.
Gyrodyne LLC Preliminary Approval Extension
Gyrodyne LLC is asking for a six-month extension on their conditional preliminary approval in St. James, giving them more time to keep the project moving without starting over.